The three constraints, in order
- Audible noise. In a quiet guest room at night, a fan above roughly 35 dB is noticed. Suction traps for rooms are specified on noise first, coverage second.
- Visible evidence. Any unit in guest sightlines should be a glue-board or concealed-tray design. Electrocuting units belong back of house.
- Service access without guest contact. Housekeeping needs to reach the tray and lamp without a ladder in a corridor at peak time.
Layout usually ends up as three layers: concealed units in guest rooms, higher-coverage units in corridors and lift lobbies, and outdoor units at terrace and pool thresholds where guests actually enter the building.
| Guest rooms | Low-noise suction trap, concealed tray, wall or skirting mount |
|---|---|
| Corridors & lobbies | Higher-coverage commercial lamp, serviceable from floor level |
| Terraces & pool deck | Outdoor-rated unit with attractant, positioned downwind of seating |
| Kitchen & back of house | Electric fly killer with shatterproof sleeving, plus glue boards |
| Typical buyer | Hotel group procurement, resort operator, hospitality distributor |
What we supply for a hospitality rollout
Room-by-room quantity take-off
Send the room count and layout type; we return a unit count per area with the reasoning, so procurement can budget it properly.
Consumables schedule
Glue boards and lamps as a scheduled repeat order, so housekeeping is never waiting on a shipment mid-season.
Branded for the property
Property logo on the housing, and manuals in the operating language of the site.
Planning a property rollout?
Room count, terrace area and the season you need it installed by is enough to start.
